Outline / Summary Cheadle Unite Together Reasons About Us NEWS Councillors/SMDC Wider Aims
Cheadle Unite

News

This Page contains ongoing news

Click on ‘Outline / Summary’ above for an overview


Click

Clin

2020 Nov Cheadle Projects 2020 Feb Inspection Hearing 2019 Oct Local Plan 2019 May Local Town Elections 2019 February: HIS Consulation 2018 October: Inspection 2018 July: Planning Inspection 2017 Aug: Consultation !! 2016 May: Consultation (Again!) 2015 Aug: Consultation Notes 2015 July: Letter to Minister 2015 June: SMDC Consultation 2015 May: Election Statements 2015 APRIL: HOUSING MINISTER 2015 April: Community Brief Pt1 2015 April: Community Brief Pt2 2015 Mar: Letter to BC MP 2015 March: SMDC SCI 2015 Feb: Letter to SMDC 2014 Oct: Petition 'Together' 2014 Aug: SMDC To Bill Cash 2014 July: Response to 190 in CE 2014 June: Bill Cash MP Response 2014 June:Letter To Bill Cash MP 2014 June:Stats For Bill Cash MP 2014 Apr: Community Involvement 2013 Sept: Cheadle East Housing 2013 Aug:Post Planning Comment 2013 Jan: Pre-Planning Comments 2012 Nov: Planning Examination 2012 Jan: Cheadle North Housing 2011 Dec: Revised Core Strategy 2011 Jan: Letter To Council 2010 Dec: Cheadle Town Plan 2010 Oct: Cheadle Town Plan 2010 Jul: Council Vote 2010 May: U-Turn on Housing 2010 Apr: Election Statements 2010 Apr: LDF 2010 Spring: Statements 2010 Jan: Councillor Statements

Headline News

Outline / Summary Cheadle Unite Together Reasons About Us NEWS Councillors/SMDC Wider Aims
Cheadle Unite

BETA Release Site Update Oct 2019:

Content is under construction

errors may exist

Together’


2012 November: Planning Inspector Examination

23rd November 2012 - Core Strategy Development Plan Document (DPD): Examination Programme


Earlier this month, Cheadle residents who submitted representations on the 'Staffordshire Moorlands Core Strategy', should have had letters from SMDC as it enters the 'Examination Programme'. The letter indicates that the Core Strategy is now going to be examined by the planning inspectorate and details how residents may want to attend a pre-hearing (10AM on the 11th December 2012 at the Bethel Suite, Tape Street, Cheadle) and/or the hearings at SMDC on the 5th of February 2013 at Moorlands House, Stockwell Street, Leek. A reply is requested by the 30th of November 2012. The letter as presented should have included 'a brief guide to examining development plan documents' and a Reply Slip.

The revised 'Core Strategy' was published in December 2011 and submitted to the Secretary of State for examination on the 25th of July 2012.It is detailed here:

www.staffsmoorlands.gov.uk/sm/examination


While the proposals for Cheadle East (M28) were dropped from the final revisedsubmission, as detailed in:

A(3) Summary of Revisions to the Submission Core Strategy December 2011 (Page 5, Modification M95)

And reflected in A(1) the 'Revised Submission Core Strategy' December 2011 (Page 217)


There are still very significant development proposals (especially in the North East), which are of clear concern to all Cheadle Residents.

The details presented by SMDC in their 31st October 2012 letter and supporting documents, make it clear that:

'No further written representations should be submitted unless they are specifically requested by the inspector'.

Further, the 'brief guide to examining development plan documents' states in the FAQ's (Question 2):


What is the nature of the legal right to be heard?

Answer: You only have the right to be heard if you are seeking a change to the document. If your representation is in support of the development plan document, you cannot speak to the inspector unless invited.

The impetus is therefore we believe to determine failings in the submitted proposal.


Cheadle Unite continues to fight for the whole of Cheadle after Cheadle East was dropped from the proposal (a proposal for which we only had a very short window in which to raise objections relating to the Cheadle East proposal -modification M28 back in in Dec/Jan 2009). We have also presented resident feedback on the Town Masterplan (Dec 2010)


Our position on the Core Strategy that has been submitted on M95 including areas 1&2 North and North East (with Cheadle East dropped) is detailed in our second submission (issued with the number 600/3573 by SMDC and available in the respondents 600 to 621 pdf at the above web link). The document includes questions on housing allocation numbers, legality and appropriate consultation on the true range of housing level options available to Cheadle as part of a regional development, working in collaboration with Stoke-on-Trent (which is in dire need of regeneration following the collapse of the 'Renew' Project), as well as forcing declining living standards on Cheadle Residents with inadequate roads, pollution and poor long term employment prospects.


We therefore encourage residents to express their views regarding the submitted proposals by returning the Reply slip to SMDC to attend the two meetings above and especially the second to attend the hearings in February next year by the 30th November. When we have more clarity on the examination procedure (detailed on the 11th of December 2012) we will let residents know the position, as we will with the consequences for Cheadle on the Planning Inspector's recommendations that follow and any further action we may take to the High Court within six weeks of any adopted plan.


Kind Regards

Cheadle Unite Committee


News

This Page contains details of news updates

Click on Outline for an overview


Click

Clin